SOUTH EAST CONFERENCE TEMPORARY SECRETARIAT
scan0044.jpg

Presently our secretariat is in a small temporary structure, part of which is the presidents residence. But there is a hope for a permanent structure. Right now, a solid foundation has been laid. This is exactly our plan for the first stage of the two-story secretariat building.  When completed the structure will house the offices, the Adventist Book Center, and a conference center.  The last floor is designed to serve as guest rooms.  When completed, it is hoped our guests will not have need to worry about befitting accommodation in South East Conference.

Here is a rundown of what it will take us to bring our dreams into reality:

SOUTH EAST CONFERENCE OF SDA

 SECRETARIAT BUILDING

FINANCIAL PLAN

 

DESCRIPTION

TOTAL COST AS PER QUANTITY SURVEYORS ESTIMATE

(IN NAIRA)

REMARK

Phase 1

Excavation of DPC (Substructure)

1,534,400.00

- Done -

Phase 2

From DPC to 1st Decking Level

459,850.00

-  Done -

Phase 3

1st Decking & Other superstructure

(Re-enforcement)

 

2,780,345.00

 

Not yet

Phase 4

Block work to 2nd Decking

459,850.00

Not yet

Phase 5

2nd Decking

2,780,345.00

Not yet

Phase 6

Block work to roofing

459,850.00

 

Phase 7

Doors, Windows, Plumbing, Finishing and painting are determined per unit and cv areas respectively

 

 

12,826,237.00

 

 

Not yet

 

TOTAL COST

N21,300,877.00

 

scan0045.jpg
SOUTH EAST CONFERENCE PERMANENT SECRETARIAT UNDER CONSTRUCTION

Another structure, which we hope to house the president and provide at least two guest rooms, has reached the roofing level.  We are praying God for funds to effect the roofing before December 2004.

 

SOUTH EAST CONFERENCE OF SDA

 PRESIDENT/GUEST HOUSE BUILDING

FINANCIAL PLAN

 

DESCRIPTION

TOTAL COST AS PER QUANTITY SURVEYORS ESTIMATE

(IN NAIRA)

REMARK

Phase 1

Excavation of DPC (Substructure)

350,000.00

- Done -

Phase 2

From DPC to Roofing stage

320,000.00

-  Done -

Phase 3

Roofing

1,500,000.00

Not yet

Phase 4

Doors, Windows, Plumbing, Finishing and painting are determined per unit and cv areas respectively

 

 

2,700,000.00

 

 

Not yet

 

TOTAL COST

N4,870,000.00

 

scan0046.jpg
PRESIDENT & GUEST HOUSE UNDER CONSTRUCTION

Our landscaping and erosion control has gone quite successful.  With the direct labour of members and staff, we have been able to rescue the land from the erosion menace.  With some more effort, the concrete work on the drive way will soon get to the main road.  We thank all the volunteers who came out to support the work.  We still pray that this kind gesture will continue when we call upon you soon for the finishing of the work.  May God bless you!

 

We shall keep you informed of other project in our next month update.